2026-08-21

  • Full project review conducted. Knowledge base recompiled incrementally; this site populated from template stubs for the first time.
  • Review finding: the project has been dormant since 2026-05-20. None of the four CRITICAL peer-review items has been started.

2026-08-20

  • Project work-log folder introduced (docs/13_작업로그/) under the cross-project logging convention.

2026-05-20

  • Data collection method document updated. This is the last substantive content change in the project to date.

2026-05-04

  • Internal structured peer review of Draft v1 completed. Five-document package produced: manuscript summary, theoretical-background mapping with citation verification, mixed-methods evaluation framework, full reviewer report, author self-critique.
  • Recommendation: Major Revision. Four CRITICAL, six MAJOR, ten MINOR concerns. None fatal; together they prevent the headline claim from being sustained at its current strength.
  • Companion document drafted on the dependent-variable problem, setting out five resolution paths.

2026-05-03

  • Draft v1 (English) assembled — five chapters, 16,759 words.

2026-04-30

  • Integrated conceptual framework v1.0 produced through the ScholarRAG synthesis pipeline.
  • Manuscript chapters and cover letters to two target journals finalized.

2026-04-14

  • Supplementary methodological documents produced: RSM time-precedence redesign, lagged panel redesign, TOE causal inference, cross-dimension interaction.

2026-04-11

  • Analysis declared complete. PICO and WOS search strategy finalized. Knowledge base compiled for the first time.

2026-03-31

  • Phase 3 (response surface analysis) complete. Final synthesis report drafted.

2022–2025

  • K-Hitech DT training panel data collected across four annual waves.