Research Log
Reverse-chronological record of project events. Entries state what happened and where the artefact lives.
2026-08-21
- Full project review conducted. Knowledge base recompiled incrementally; this site populated from template stubs for the first time.
- Review finding: the project has been dormant since 2026-05-20. None of the four CRITICAL peer-review items has been started.
2026-08-20
- Project work-log folder introduced (
docs/13_작업로그/) under the cross-project logging convention.
2026-05-20
- Data collection method document updated. This is the last substantive content change in the project to date.
2026-05-04
- Internal structured peer review of Draft v1 completed. Five-document package produced: manuscript summary, theoretical-background mapping with citation verification, mixed-methods evaluation framework, full reviewer report, author self-critique.
- Recommendation: Major Revision. Four CRITICAL, six MAJOR, ten MINOR concerns. None fatal; together they prevent the headline claim from being sustained at its current strength.
- Companion document drafted on the dependent-variable problem, setting out five resolution paths.
2026-05-03
- Draft v1 (English) assembled — five chapters, 16,759 words.
2026-04-30
- Integrated conceptual framework v1.0 produced through the ScholarRAG synthesis pipeline.
- Manuscript chapters and cover letters to two target journals finalized.
2026-04-14
- Supplementary methodological documents produced: RSM time-precedence redesign, lagged panel redesign, TOE causal inference, cross-dimension interaction.
2026-04-11
- Analysis declared complete. PICO and WOS search strategy finalized. Knowledge base compiled for the first time.
2026-03-31
- Phase 3 (response surface analysis) complete. Final synthesis report drafted.
2022–2025
- K-Hitech DT training panel data collected across four annual waves.